50 mw
Operational 2017
132kV iDNO Connection
UKPD
Cottingham
Humberside
Creyke Beck Power located near Cottingham, Humberside, is comprised of 11 gas fired reciprocating engines and has a combined capacity of 50MW.
The site can turn on, reaching its full output capacity in less than 10 minutes, and provide a sustained delivery of electricity to the grid according to system needs, whether that be due to a shortage in network connected generation or an increase in overall UK demand. Our gas generators are chosen for maximum efficiency and designed for minimum cost per unit of energy produced, reducing the cost of electricity to all consumers, whilst also meeting all current emissions legislation.
Partners & owners
Project owner: Statera Energy
Project O&M: Statera Energy Operations
Technology
Flexible generation
-
Capacity
50mw
-
Response time
< 10min
-
Duration
Unlimited
-
Homes powered
110,000